Disinfection equipment

Sodium Hypochlorite Generators

Equipment inquiries for sodium hypochlorite generation and related project supply.

Blue and white sodium hypochlorite generator cabinet with associated equipment

Application & product range

For water treatment projects considering sodium hypochlorite generation equipment. Selection requires project conditions and a confirmed technical specification.

Product series

  • Cabinet-type equipment, with catalogue sizes from 50 to 500 g/h available chlorine
  • Larger electrolysis assemblies, with catalogue sizes from 1,000 to 50,000 g/h available chlorine

Configuration & specifications

  • The supplied catalogue shows cabinet and modular electrolysis arrangements
  • Salt preparation, storage, dosing and site interfaces require a defined project scope
Selected model data. Final configuration is specified for your application.
ParameterCatalogue reference
Catalogue output range50–50,000 g/h available chlorine across the listed sizes
Solution concentration listed6,000–9,000 ppm (0.6–0.9%)
Brine concentration listed3% dilute brine; feed-water conditions require project review
Reference size200 g/h catalogue row
AC power listed for 200 g/h1.2 kW
Water use listed for 200 g/h0.6 m³/day
Salt use listed for 200 g/h16.8 kg/day
Dimensions listed for 200 g/h1,225 × 700 × 2,015 mm

Selected catalogue sizes

Catalogue reference values. Confirm the selected model and configuration before ordering.

Available chlorine (g/h)AC power (kW)Water (m³/day)Salt (kg/day)Dimensions (mm)
500.30.154.21,225 × 700 × 2,015
2001.20.616.81,225 × 700 × 2,015
5003.01.5421,225 × 700 × 2,015
1,0004.73841,225 × 700 × 2,015
2,0009.461682,650 × 1,000 × 1,930
5,00023.5154202,650 × 1,000 × 1,930

Source: KUOSI sodium hypochlorite catalogue, printed pages 06–07 (PDF pages 8–9). Values are catalogue references, subject to model and project confirmation.

Supply & customization scope

Supply scope

  • Sodium hypochlorite generation equipment for an agreed output and application.
  • Generator, feed-water equipment, storage, dosing and controls are itemized in the project quotation; the package scope varies by project.

Final scope, configuration and responsibilities are confirmed for the specific requirement.

To begin product selection

  • Application and required treatment duty
  • Available feed water information
  • Site utilities and installation conditions
  • Required equipment boundaries and delivery schedule

Product literature

Request product documentation

Please include the documents you need in your inquiry.

Start with a conversation

Your requirements.
A clearly defined next step.

Tell us what you are building, sourcing or planning.

Discuss Your Project